Restoration of National Lands in the Zeydoon Plain Area Project name: Restoration of National Lands in the Zeydoon Plain Area Status Completed Registration Date 2019/11/27 Update Date 2019/11/27 Manager Land Bank Goals Supplying the water demands of the 2090 hectares of farmlands on the southern shore of The Aras River; Schedule 1st and 2nd Phase Studies, Supervision (3rd Phase) Executive Actions Irrigation method: Sprinkler and drip irrigation systems; Length of the transmission line: 12.6 km; Transmission line diameter: 1000 mm fiberglass (GRP) Pumping stations: 2 Construction sites: 2 Number of Farms: 20 Geography Location Maku County, West Azerbaijan Province, Iran