Revision Studies of the Shibloo Pumping Station ... Project name: Revision Studies of the Shibloo Pumping Station, Water Transmission Network and Pipeline Status Completed Registration Date 2019/11/27 Update Date 2019/11/27 Manager West Azerbaijan Regional Water Company Goals Revision and improvement of the current irrigation and drainage network plan, increasing the utilization of the potentials of the water resources and its development to the maximum level; Schedule 1st and 2nd Phase Studies Executive Actions Pump station with a capacity of 2.7 cu.m/s; Steel water transmission pipes length: 15 km; Canal length: 41 km; Geography Location Maku County, West Azerbaijan Province, Iran