Establishing and Supervising the Water and Agriculture Management System for 2, 3, 4, and 5 Sec. No. of Karamabad Project Project name: Establishing and Supervising the Water and Agriculture Management System for 2, 3, 4, and 5 Sec. No. of Karamabad Project (Irrigation and Drainage Subnetwork of Karamabad Project) Status Completed Registration Date 2018/09/29 Update Date 2019/12/01 Manager Deputy of water and soil and industries of Ministry of Agriculture Jihad Goals Study, Design and supervision of the construction of the 19250 hectare of Irrigation and Drainage subnetwork; Investigating and establishing the management system. Schedule Project supervision (3rd Phase) Executive Actions Irrigation method: Semi-portable sprinkler, center-pivot, and localized irrigation (drip tape) systems; Pipe diameter: 63 - 450 mm, PE pipes Constructing technical buildings; Establishing cooperatives around the management of water resources. Geography Location Poldasht and Shut Cities, West Azerbaijan Province, Iran