1st and 2nd Phase Studies of the Current Drinking Water Distribution Network of Shahr-e-Rey Area
Project name: 1st and 2nd Phase Studies of the Current Drinking Water Distribution Network of Shahr-e-Rey Area
Completed
2018/09/29
2019/11/27
Manager

Tehran Province Water and Wastewater Co. Region 6

Goals
  • Modeling the current water distribution network supplying the Shahr-e Rey area and pointing out and resolving its weaknesses;  
  • Investigating population growth and urban development in the region;  
  • Designing a water distribution network to meet future requirements at the end of the plan period;
Schedule

1st and 2nd Phase Studies

Executive Actions
  • Local population size: 3400000 
  • Estimated population by the planning horizon: 406000    
  • Plan area size: 3500 hectares
  • Users: 4500 
  • Tanks feeding the network: three 20,000 cu. m tanks
  • Consumption per capita by the planning horizon: 240 per day per sq. meter
  • Maximum daily volumetric discharge: 1804 lit/s
  • Maximum hourly volumetric discharge: 2706 lit/s
  • Annual yearly water demand by the planning horizon: 35.56 million cu. m    