Feasibility and conceptual studies for the construction of desalination plant of Persian Gulf Fajr Energy Company Project name: Feasibility and conceptual studies for the construction of desalination plant of Persian Gulf Fajr Energy Company Status In Progress Registration Date 2024/07/14 Update Date 2024/07/14 Manager Persian Gulf Fajr Energy Company Goals Feasibility study and conceptual design of water extraction from the Persian Gulf and wastewater discharge, construction of a desalination plant with a capacity of 500,000 cubic meters per day and a transmission line to the complex Schedule 1st and 2nd Phase Studies Executive Actions Investigating, conducting studies and collecting existing information from Fajr company and surrounding areas Conceptual design of a water extraction system from the sea with a water extraction capacity of 1,700,000 cubic meters per day. For this purpose, the following activities have been carried out: Basic hydrodynamic studies including wind, wave and flow hydrodynamic studies, sediment and morphology studies Investigating different methods of taking water from the sea and selecting the best option Conceptual design of water intake system, land site and water transmission pipeline Sea water recirculation studies for the selected and final option (seawater recirculation) Conceptual design of desalination facilities and providing their minimum design and functional requirements. Desalination facilities have been developed in 5 phases each with the capacity to produce 100,000 cubic meters of desalinated water per day. Routing and conceptual design of desalinated water transmission line with a diameter of 1800 mm Investigating how to supply 150 megawatts of electricity for water catchment facilities, desalination plants and water transfer pump houses Obtaining legal licenses with the cooperation and cooperation of the employer, including the water allocation license from the Ministry of Energy, the license from the Ports and Maritime Organization, the license from the Environment Organization of the country, the license from the Fisheries Organization, the license from natural resources, the license from the Petrochemical Special Economic Zone Organization, License from regional water, license from regional electricity, license from Ministry of Roads, license from armed forces, etc Economic and financial studies, the estimated investment cost of the project and the total price of water are about 34 thousand billion and 430,000 rials, respectively. Geography Location Khuzestan Province, Mahshahr City, Petrochemical Special Economic Zone.