Sunday Sep 8, 2024
Detailed studies on how to secure the Karaj River banks in the area of ​​the Amir Kabir dam and the Amir Kabir regulatory dam
project name: Detailed studies on how to secure the Karaj River banks in the area of ​​the Amir Kabir dam and the Amir Kabir regulatory dam
In Progress
2024/07/03
2024/07/03
Manager
Tehran Regional Water Company
Goals
  • Identification and investigation of damages caused by floods
  • Using efficient methods to reduce the effects of floods
  • Sustainable drinking water supply in Alborz and Tehran provinces
Schedule
1st and 2nd Phase Studies
Executive Actions
  • Conducting specialized visits in order to check possible changes in the scope of the plan
  • Identifying critical areas and critical points and checking the necessity and non-necessity of implementing emergency plans
  • Collecting and reviewing reports and documents, revising or updating previous stage studies if necessary
  • Estimating the implementation costs of immunization plans
Geography Location
Alborz Province/ Amirkabir Dam