Tuesday Dec 17, 2024
Flood control and surface water collection in Sarcheshme Copper Complex
Project name: Flood control and surface water collection in Sarcheshme Copper Complex
Future
2024/07/03
2024/07/03
Manager
Iran National Copper Industries Company - Sarcheshme Copper Complex
Goals
  • Identification of flood-prone areas and vulnerable areas
  • Providing a solution to control and contain floods
Schedule
1st and 2nd Phase Studies and supervision (3rd Phase)
Executive Actions
  • The total area of the watershed is about 46 square kilometers and has 17 main basins
  • 8 kilometers of existing surface water collection sub-channel
  • 8.5 kilometers of the existing main river and waterway to collect surface water
  • Investigation of 20 critical points at the basin level
  • About 40 km of improvement the surface water collecting canals and directing the surface waters
  • Presenting the ideal pattern for collect and control the surface water and flood control plans
Geography Location
Kerman Province / Mes Sarcheshmeh