Flood control and surface water collection in Sarcheshme Copper Complex Project name: Flood control and surface water collection in Sarcheshme Copper Complex Status Future Registration Date 2024/07/03 Update Date 2024/07/03 Manager Iran National Copper Industries Company - Sarcheshme Copper Complex Goals Identification of flood-prone areas and vulnerable areas Providing a solution to control and contain floods Schedule 1st and 2nd Phase Studies and supervision (3rd Phase) Executive Actions The total area of the watershed is about 46 square kilometers and has 17 main basins 8 kilometers of existing surface water collection sub-channel 8.5 kilometers of the existing main river and waterway to collect surface water Investigation of 20 critical points at the basin level About 40 km of improvement the surface water collecting canals and directing the surface waters Presenting the ideal pattern for collect and control the surface water and flood control plans Geography Location Kerman Province / Mes Sarcheshmeh